BK4A PLATFORM
- Chủ đầu tư:VSP
- Loại dự án: Phát triển mỏ
- Địa điểm:Block 9-1 – Cuu Long Basin - Vietnam
- Thông tin chi tiết:
- Duration : 2014
- Scope of work: FEED & Detailed Design
-
Project description:
The BK-4A riser platform is located in the White Tiger Oil Field, approximately 145km South-East of Vung Tau city of Vietam. The BK-4A riser platform isconnected to the existing BK4 platform via linking bridge.
The BK-4A riser platform consist of topside and jacket. It is able to receive gas – condensate at low pressure condition from the Thien Ung platform (B-TNG) via NCS2 gas pipeline (phase 1) and transport to BK-4 riser via linking bridge. One Pig receiver 26” is installed on the topside of BK-4A platform to receive pig launched from BK-TNG platform via the NCS2 gas pipeline (phase 1).