TE GIAC TRANG - H5 FIELD DEVELOPMENT
  • Chủ đầu tư:Hoang Long JOC
  • Loại dự án: Phát triển mỏ
  • Địa điểm:Block 16-1 - Cuu Long Basin (Vietnam)
  • Thông tin chi tiết:

    • Duration :  2014 – 2015
    • Scope of work: FEED & Detailed Design
    • Project description:

    The TGT field is geographically located in the northern pert on Block 16-1 in the Cuu Long Basin approximately 100km southeast of Vung Tau; 20km northern of the Bach Ho field and 35km west of the Rang Dong field.

    The block in operated by a joint operating company, being the Hoang Long Joint Stock Company (HL JOC).

    TGT field is divided into H1, H2, H3, H4 and H5 fault block.

    The H5 field is developed using an unmanned Well Head Platform (WHP) tied back to existing infrastructure via number of subsea pipelines.

    The H5-WHP is unmanned platform equipped with 12 slots comprising of 8 dual slots and 4 single slots. Production from H5-WHP is flow via a single 12” insulated multiphase pipeline which is to transport well stream to the FPSO for processing and exporting, one 8” pipeline is to transport lift gas from H4-WHP for gas lift application. 

     