Project: DAI HUNG MINE DEVELOPMENT – PHASE 3 Client: PVEP-POC/ VSP Location: Batch 05-1(a), tank Nam Con Son Duration: 2021-2022 Scope of work: Detailed design
Project: KINH NGU TRANG FIELD DEVELOPMENT Client: VSP Location: Block 09-2/09, Cuu Long tank Duration: 2022 Scope of work: Detail design
Project: SU TU TRANG FIELD DEVELOPMENT – PHASE 2 Client: Cuu Long JOC Location: Block 15.1 (a), Cuu Long tank Duration: 2021-2022 Scope of work: FEED design
Project: NAM CON SON 2 GAS PIPELINE Client: PVGAS Location: Cuu Long and Nam Con Son tank Duration: 2021-2022 Scope of work: Establish FS, FEED and detail design.
Project: LONG SON OIL REFINERY COMPLEX PROJECT Client: Investor: SCG- LSP, General contractor EPC: Samsung Engineering Company Ltd (SECL). Location: Bà Rịa – Vũng Tàu Duration: 2019-2022 Scope of work: Performing EPC for TCF items for general contractor SECL. Construction of SMP items of bidding package PP Plant (Package C)
Project: LNG BAC LIEU – ONSHORE GAS PIPELINE PROJECT Client: Delta Offshore Energy (DOE) Location: Bac Lieu Duration: 2021 Scope of work: FEED design
Project: DAM DOI FIELD DEVELOPMENT. Client: Investor: PVEP Location: Block 46/13 – Block Malay – Block Tho Chu Duration: 2015 Scope of work: Basic design
Project: LOOP PIPELINE – CA MAU GAS PROCESSING PLANT Client: PVGAS. Location: Ca Mau. Duration: 2015. Scope of work: FEED and detail design.
Project: TIEN HAI – THAI BINH LOW PRESSURE GAS DISTRIBU TION PROJECT. Client: PVGAS. Location: Thai Binh Duration: 2014-2015 Scope of work: – Topographic and geotechnical survey; – Detailed Design.
Project: THIEN UNG FIELD DEVELOPMENT Client: Investor: Vietsopetro Location: Block 04.3 – Nam Con Son Basin – Vietnam Duration: 2014-2015 Scope of work: FEED and detail design.


Tiếng Việt








